Bitter Creek Bridge No: 0554 Highway No. 37A

Project Info

Location: 10 KM south of Stewart, BC
Year: 2013
Owner: Ministry of Transportation and Infrastructure
Contract Value: $5,931,947.00

Description

Project consists of the demolition of an existing bridge, construction of a 51 meter, clear span bridge and removal of a detour bridge.  This includes the installation of steel pipe piles, errection of structural steel, precast concrete members, deck panels, pile caps and bridge parapets, using instream diversions.  9,000 cu m riprap will be drilled and blasted to provide protection for the guide banks and road works associated with the realignment and widening of the approaches.